Irrigation Infrastructure
Pokhara Khola Magar Besare Khanitar Chhangtar Irrigation Project
Field and project engineering work on a lined irrigation system with canals, pipelines and hydraulic structures. My responsibilities included surveying, site supervision, measurement, quality checks and contractor billing.
Dibyashwori/Om JV · Aug 2025 – Mar 2026 · Project handed over
My involvement
I supported day-to-day field and project activities from survey and setting-out through construction monitoring, quantity measurement, quality checks and billing. The work required close attention to drawings, site conditions and the sequence of hydraulic and protection works.
Scope
Hydraulic infrastructure
- Lined irrigation canals
- Concrete-lined sections and pipeline sections
- Syphons, VRB and super passages
- Intake and reservoir tank
Protection & energy control
- Water-dissipating structures
- Gabion walls
- Masonry walls
Responsibilities
- Site supervision and construction monitoring
- Surveying, setting-out and alignment-related field work
- Auto Level and Total Station leveling and measurement
- GPS-based ground profiling
- Drawing interpretation and checking
- Concrete, reinforcement, masonry/gabion and pipeline checks
- Quantity measurement, BOQ checking and contractor billing
- Measurement-book and progress documentation
- Coordination with consultants/client representatives
- Material quality/testing and construction quality checks